Haul Systems
 
Electrically powered haul units, lightweight track and maximum capacity dirt buckets work together to transport the spoil from the boring head (T.B.M.) to the shaft.

Tracks connect quickly with a single bolt and wing nut. Dirt buckets sized for the pipe of tunnel being installed remove the spoil, and offer easing dumping features for maximum production.