Electrically
powered haul units, lightweight track
and maximum capacity dirt buckets work
together to transport the spoil from the
boring head (T.B.M.) to the shaft.
Tracks connect quickly with a single bolt
and wing nut. Dirt buckets sized for the
pipe of tunnel being installed remove
the spoil, and offer easing dumping features
for maximum production. |